Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Sep 16, 2023     41-7 upper forward fuselage installation step1-4 - (4 hours) Category: Fuselage
cut the shims for the hinges using the 0.20 2024T4 strips. Drilled the pilot hole, deburred everything.
Cut to measure the different hinges F-1001N, F-1001P, F-1001Q.
Drilled the pilot holes ONLY on the AFT sections of the different hinges. Used the 1/8 hinges.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.